There were two used machine for 5-lb Can Filling & Sealing which were made in Spain during 1960's. The main parts were seriously worn and degraded after 30 years of operation. One of them was used on the hot-sauce production line with 20% downtime, and the other one could never be used for production. Difficulties encountered in reverse-engineering the machine were:
1. The machine was outdated, and the manufacturer no longer stored or manufactured any parts for it. The manufacturer also would not provide any technical document (such as blueprints).
2. The machine was designed in Metric Measurement System, it was hard to find a qualified local vendor to make parts.
In just two months, the project produced a result which was satisfactory for production.