Opinion Contact   中文 
 
REVERSE ENGINEERING-TESTING SYSTEM

The product testing system reverse-engineering/updating project included:

1) Collecting and streamlining hundreds of documents from 5 sources.

2) Reorganizing the structure of drawings.

3) Correcting errors.

4) Reverse-engineering omitted drawings.

RESULT: Reduced file handling time from 13 minutes to 1 minute.