Opinion Contact   中文 
 
 

KEY SKILLS & KNOWLEDGE AREAS

  IQ/OQ/PQ, PI, BOM, ECN, RCA, FMEA   SolidWorks, AutoCAD, Pro/E, ASME Y14.5M, GD&T
  Lean Mfg. 6-sigma, ERP, SAP, CAPA   C-10 electrical license, PLC, CNC, RF, LabView
  ISO 9000, 9001/13485, FDA QSR, GMP   Metal & plastic processing, Equipment operation

PROFESSINOL EXPERIENCE

EDWARDS LIFESCIENCES - Irvine, CA (Product: Medical device)

R&D Project Engineer (3/2010-Present) [contract]
  Optical Cable Connector Tester design
 • Auto coating machine design includes flow/air/electrical control and programming
 • Manufacturing Fixture design

ARBOR SURGICAL TECHNOLOGY - Irvine, CA (Product: Heart Valve) 

Manufacturing Engineer (10/2007-11/2009)

Provided technical support to manufacturing, R&D, and machine shop. Generated Engineering Changes.

 

Designed and built an automatic Fatigue Testing system that includes RF generator & electromagnet system with saline water circulation and Labview monitoring. The documentation included 85 component and assembly drawings.

 

Simplified structure of heart valve by improving the frame assembly design, reducing the number of parts by 30% and enhancing product durability.

 

Improved documentation of Accelerated Life Tester; integrated and streamlined drawings from 5 sources to reduce file handling time from 13 minutes to 1 minute.

 

Generated IQ/OQ for high temperature furnace to improve the traceability of the nitinol product; increased process productivity by factor of 12.

 

IRVINE BIOMEDICAL / ST.JUDE - Irvine, CA (Product: Heart Catheter)

Manufacturing Engineer  (10/2006-10/2007)

Supported manufacturing by solving production issues. Improved processes and introduced new products. Signed daily Non-conforming Materials Report. Generated engineering changes on BOM, PI, Router and drawings.

 

Implemented Lean Manufacturing to increase yield of FC from 91% to 100%.

 

Investigated "action wire broken" problem which had caused complete product failure;  improved assembly handling process to solve this 5-year-old issue.

 

Researched "electrical short" problem which had caused complete catheter failure, improved assembly design and process to solve this 7-year-old issue.

 

Improved training program by creating clear and concise flow diagram with main manufacturing process images and codes.

 

Repaired and developed test plan for new Induction Welder to solve 2-year-old issue.

 

Conducted testing of a thousand samples, and wrote report for plastic fusing process.

 

Generated process instruction (PI) for plastic tube fusing, which improved the stability of the process and increased productivity by 8%.

 

Introduced pneumatic welding system and performed process validation.

 

Introduced automatic equipment which increased productivity by a factor of 10.

 

Adopted the CNC lathe to make electrode more accurate and consistent, reducing the cost of labor and materials.

 

Solved 5-year-old “short band” issue on connector assembly and improved process quality from 95% to 99%.

 

Analyzed root causes of “broken plunger” problem and conducted quality meeting with QC and vendors; reduced rejection rate by 12% and increased productivity by 8%.

 

Utilized FMEA and 6-sigma tool to reduce “non-continuity” scrap by 7%.

 

Investigated contaminated package from customer; traced source of contamination to international supplier to eliminate the issue.

 

Performed CAPA with Regulatory Compliance Department by dissecting “S” curve reject from customer and provided practical improvement recommendation.

 

Worked on non-conforming screw problem with local and international suppliers to solve 2-year-old issue.

 

 

STAAR SURGICAL - Monrovia, CA (Product: Implantable Lens)

Manufacturing Specialist  (6/2004-5/2006)

Sustained manufacturing. Scheduled/supervised equipment maintenance and calibration.

 

Improved design of high precision fixtures to reduce maintenance time from 8 hours to 30 minutes.

 

Performed IQ/OQ for new annealing oven and temperature controller/recorder.

 

Improved maintenance process for PLC-pneumatic hot-glue packaging system to eliminate safety issues.

 

Improved the preventive maintenance documentation system by establishing PMP’s, updating equipment data base, and organizing engineering shop and parts inventory.

 

Provided training for programming and maintenance of PLC hydraulically- controlled heat molding system.

 

BCC Inc. /LKK Inc. – City of Industry, CA (Product: Sauces, condiments)

Engineering Engineer (5/1991-4/2001)

 

Designed and built product cooling system, which included cooling tower, chiller, HVAC wiring, electrical control, and piping system; increased productivity by 15%.

 

Troubleshoot and adjusted the filling machine to solved 6-moths issue.

 

Improved cam plate design for new plastic bottle capping machine, saving 1200 labor hours per month.

 

Conducted the failure analysis meeting and completed the accident investigation for the deformation of a 2000-gallon steam cooker; result was a large settlement from the vendor’s insurance for the defective equipment.

 

Generated plant layouts for storage management, pest control, and fireproofing system management.

 

Conducted the overhaul of two 5-lb Can Filling & Sealing Machines that were made in Spain 25 years ago.

 

Established the documentation system for the engineering department to meet ISO 9001 and GMP standards.